This 25-acre stormwater management and green infrastructure demonstration park is located on a site that was previously a church campus. As part of the Gentilly Resilience District, this exciting demonstration project includes a pump station, energy dissipation runnel, large detention basins, multiple concrete weirs, observation walkways, and several buildings. Batture is a sub-consultant to Waggonner & Ball, LLC on this innovative project. This project is under construction!






For this project, Batture performed the following services:
- Topographic Survey
- Utility Survey
- Structural Engineering Design
- Foundation Design
- LID Concrete Design
- Construction Administration
Project Status: In-Construction